Union Street Study Area

Print
Press Enter to show all options, press Tab go to next option
   WHAT ARE WE DOING
  • September 7, 2017: City staff met with the Union Street Study Area. Meeting minutes will be available soon. 
  • July 31, 2017: Letters were mailed to all residents in the study area inviting them to the open house.
  • July 18, 2017: City council presentation to review the stakeholder engagement process to review and refine improvements to reduce the risk of flooding.
  • June/July 2017: City experienced successive and excessive rain events leading to the total rainfall for June and July of almost 20 inches, over double the normal average.
  • Fall/Winter 2014: The existing drywells throughout the area were cleaned and a column drain installed in the bottom to further assist in water going into the ground in this area.
  • 2013-2014: An analysis of how to improve the drainage in the area was completed by the City’s stormwater consultant.
   HISTORY

Union Street Study Area 

  • This area was developed at two different times. The streets in the western portion near McHenry Avenue were laid out in the 1920s as part of the Uteg subdivision. The streets in this section include College, 1st Court, 2nd Court, Uteg, and Wallace Avenue.
  • The eastern portion was developed as the Colby subdivision in the 1950s. The street in this section include Jackman, Harold, Mary, Keith, and Eugene.
   COMMENTS
We want to hear from you! Please submit your questions, concerns, and stories to: stormwatersolutions@crystallake.org

Please don't forget to include your name, address, and phone number so the City can get back to you. Pictures are appreciated, but the City can't receive emails with a total of over 10 MB of attachments.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer